Demolition produces heavy, mixed debris: concrete, brick, lumber, roofing and drywall.

How Demolition Debris Removal Works
A 30- or 40-yard is usual for a whole-structure demolition, but heavy masonry should go in smaller boxes to stay within weight limits. Plan on multiple swaps for larger projects and keep paths clear for trucks.
What This Is Used For
- Partial and whole-structure demolition
- Interior gut jobs
- Garage and outbuilding teardown
What to Watch For
Check for asbestos and lead before demolition on older buildings. Testing and abatement should be done by licensed professionals.


Recommended Dumpster Size
30–40 yd for mixed debris; 10 yd for heavy masonry.
Related Services
FAQ
What size dumpster for a demolition?
A 30- or 40-yard for mixed debris. Use 10-yard boxes for heavy masonry.
Do I need to test for asbestos?
For older buildings, testing is recommended before demolition. Hire a licensed professional.
Can I mix concrete with other debris?
It is usually billed as mixed. Keep heavy material separate.
Get a Dumpster Quote in Rapid City
Tell us your address, project and timing. We confirm the size, tons included, rental days and overage rate in writing.
Call (605) 555-0142 Request a Quote